Project | Nonsuch High School of Girls Sixth Form Centre

M&E Works to the New 6th form Centre

Project Overview:

M&M Moran was entrusted as the contractor for a comprehensive project involving the upgrades to the Nonsuch High School – Sixth Form Centre, comprising over 20 classrooms, offices, and communal areas. The objective was to enhance the overall quality, safety, and functionality of the premises to provide an improved learning environment for the students. As part of this objective, M&M Moran was tasked with providing a comprehensive electrical and mechanical fitout, including a complete electrical system with power and lighting, and a complete mechanical system with heating, ventilation, and air conditioning, to ensure a functional and comfortable learning environment for the students.

Nonsuch High School – Sixth Form Centre:

M&M Moran successfully executed a full M&E fitout, including air conditioning, to meet the requirements of the Sixth Form Centre at Nonsuch High School. The scope of works included the following:

Full Electrical Fitout:
M&M Moran installed a complete electrical system, including power and lighting, to provide a safe and reliable source of electricity throughout the Sixth Form Centre. The electrical system was designed and installed to comply with all relevant regulations and industry standards. This included wiring for all power outlets, lighting fixtures, and data points, ensuring all areas of the centre had adequate power supply and lighting.

Full Mechanical Fitout:
M&M Moran installed a complete mechanical system, including heating and ventilation, to provide a comfortable and healthy learning environment for the students. The mechanical system was designed to meet the specific requirements of the Sixth Form Centre, providing efficient heating, ventilation, and cooling for all areas. The system was installed to ensure optimal performance, energy efficiency, and compliance with relevant regulations and standards.

Air-Conditioning:
To ensure proper temperature control and air quality, M&M Moran installed an air conditioning system that met the specific needs of the Sixth Form Centre. The system was installed to provide a comfortable and healthy learning environment for the students. It was designed to ensure optimal performance, energy efficiency, and compliance with relevant regulations and standards. The air conditioning system was also equipped with air filtration technology to ensure the highest levels of air quality, contributing to the overall health and well-being of the students.

Conclusion:
M&M Moran, as the appointed contractor for the M&E fitout project, successfully executed a comprehensive range of works to provide a functional and comfortable learning environment for the students at Nonsuch High School Sixth Form Centre. Through meticulous attention to detail, adherence to industry standards, and effective project management, M&M Moran achieved outstanding results. The upgraded facilities now offer a safe, reliable, and comfortable space for the students to learn and thrive. M&M Moran’s expertise and commitment to excellence have contributed to the success of this project and the satisfaction of all stakeholders involved.

Project Info

Client Project

Nonsuch High School for Girls

Location

United Kingdom, Cheam

M&M Moran was tasked with providing a full mechanical and electrical fitout, including air conditioning, to create a comfortable and functional learning environment for Nonsuch High School’s new Sixth Form Centre.

Gallery

Follow Us

Our team at M&M Moran is proud to showcase the gallery images at Nonsuch High School – Sixth Form Centre, displaying our attention to detail, expertise in joinery works, and commitment to delivering a high-quality finish.

CONTACT US

Got a project you’d like to talk to us about?

Thank you for your interest in M&M Moran. We welcome all enquiries and upon submission of the form one of our team will be on hand to assist you.

Name
Which service(s) are you interested in?
This field is for validation purposes and should be left unchanged.